Private utility locating in 44 U.S. metros

Pinnacle Utility Locating

Damage Prevention

Damage prevention programs for contractors and owners who cannot afford a utility strike. We review tickets, locate private plant, document marks, and support 811 workflows so excavation stays inside a verified window.

Locator and project manager reviewing a locate ticket and site plans on a work truck at a jobsite

Scope of work

  • 811 ticket review and private-line gap analysis
  • Photo and written locate records
  • Pre-excavation briefings with the crew
  • Multi-site programs for GCs and owners

What your proposal includes

  • Coverage areaYards, corridors & structures
  • MethodsEM, GPR, scan & mapping
  • Locate windowKeeps site operational
  • ScheduleTicket review to closeout
  • TurnaroundTypically 48 hours
Start a scope

How we work

A five-stage delivery process

Predictable execution from first ticket review to documented closeout — at every stage.

  1. 01

    Ticket & site review

    We review the 811 ticket, as-builts, and access, then walk the property to confirm what public marks miss before quoting.

  2. 02

    Scope & proposal

    You receive a written scope with methods, coverage area, deliverables, and pricing — typically within 48 hours.

  3. 03

    Field locating

    Crews apply EM, GPR, and concrete scanning as specified and paint APWA color-coded marks on the ground.

  4. 04

    Mapping & records

    Marks are documented with photos, sketches, or CAD/GIS mapping so the next crew is not starting from zero.

  5. 05

    Closeout

    You receive locate records, maps, and a documented closeout your superintendent can file with the job.

FAQ

Damage Prevention questions

How quickly can you provide a proposal?

Most commercial proposals are delivered within 48 hours of the site review. Multi-site or mapping programs may take slightly longer because each location is scoped for access, methods, and deliverables individually.

Do you locate utilities that 811 does not mark?

Yes. Public one-call marks the utilities that member companies own. Privately owned electric, water, comms, irrigation, and process lines on the customer side of the meter are our primary work — and the lines most often hit.

Are you licensed, insured, and able to meet vendor requirements?

Our crews carry general liability and workers' compensation coverage in the markets where they operate, and we regularly complete vendor onboarding, insurance certificates, and safety documentation for GCs, industrials, and property managers.

When do you use GPR instead of electromagnetic locating?

Electromagnetic locating is the first method for conductive lines. We add GPR for plastic pipe, unknown utilities, voids, and concrete scanning. The proposal states which methods apply to your soil, surface, and utility types.

Get your damage prevention proposal

Request a site assessment and receive a written scope with methods, coverage, and pricing — typically within 48 hours.

Find your market Get estimate